Demolition
Demolition Debris Removal in Arlington, TX
Containers for teardowns, interior gut-outs, sheds, fencing and patio covers — plus the two Arlington timelines that decide when a machine can actually start: the 50-year landmark review and the DSHS notification.
Demolition here covers a wide spread of jobs. A detached shed or a rotten fence line is a morning. An interior gut-out of a kitchen, a bath and the panelling behind them is a week. A full structure teardown is a project with a permit file attached to it, and Arlington issues demolition permits through the commercial building permit system with an aerial site plan showing the limits of demolition, proof of an asbestos survey, and a stormwater pollution prevention plan once the site is over an acre. What goes in the container is the easy part. The paperwork is what sets the start date.
The first Arlington timeline is the 50-year rule. If a building is 50 years or older, if its age cannot be established, or if it sits in the Landmark Preservation Overlay, the Landmark Preservation Commission has to review the demolition. The commission generally meets the second Thursday of the month and applications must be in at least nine business days ahead. It cannot deny the permit — it can release it or extend the Historic Stay for another 45 days. Arlington's stock is now old enough that everything built through roughly 1976 trips that trigger, which is a very large share of central and north Arlington.
The second is asbestos, and it is the fact most commonly got wrong about Texas. Notification goes to the Department of State Health Services, not to TCEQ, at least 10 working days before demolition or abatement begins — about two calendar weeks in practice, longer across a holiday. It is required even when no asbestos is present, so a clean survey does not remove the duty. Stack those two timelines on a pre-1976 teardown and the critical path is filing, meeting, possible stay, notification, then the machine. See the Tarrant County debris guide.
Demolition Work We Set Containers For
Interior Gut-Out
Cabinets, panelling, drywall, ceiling texture, flooring and trim out of a 1960s or 1970s ranch, back to studs and slab. Steady volume, and heavier once mortar-bedded tile appears.
Detached Shed And Outbuilding
Metal and timber sheds at the back fence, usually with a soft floor and thirty years of contents. Frame, roof panels, slab pad and all, generally inside a single container.
Fencing And Gate Removal
Cedar pickets, rails, posts and the concrete footings that come up with them. Long, awkward material that loads better broken down than fought into the box in full panels.
Patio Cover And Carport
Aluminium and timber covers, lattice, posts and the roofing over them. Light and bulky, so these close a container on volume long before weight becomes the question.
Kitchen And Bath Strip-Out
Cabinets, laminate, cast iron tub, tile and the wall behind it. The tile and its mortar bed run heavy enough to change the size we recommend for the whole job.
Garage Conversion Reversal
Turning a converted garage back into a garage: partition walls, ceiling, flooring, wiring and the infill panel where the door used to be. Mixed light debris with awkward pieces.
Pool Surround And Flatwork
Coping, decking and the concrete around a pool. This goes in its own part-filled box, because concrete reaches payload while the container still looks half empty.
Full Structure Teardown
A house or a small commercial building down to grade. Permit, aerial site plan, asbestos survey, notification and possibly a landmark review before anybody starts a machine.
Sizing And Phasing A Demolition Container
Interior gut-outs and single-structure demolition usually run a 30 yard, which takes framing, drywall, cabinets, roofing and trim without a swap on most Arlington houses. Larger teardowns and commercial work go to a 40 yard where the lot has the length for a container that long and the truck has a straight approach. Take a 20 yard when the material is dense rather than bulky — a bath and kitchen strip with mortar-bedded tile, or a shed on a small lot — because a bigger box in that situation is one you cannot legally fill. Keep concrete, brick and footings out of the mixed container entirely and run them in a separate part-filled box. Phase it by trade: give us the strip-out, structure and clean-up dates and the swaps land between them.
20 Yard Dumpster
Garage, attic and shed clear-outs, multi-room renovations, deck and fence tear-offs.
View this size →30yd³30 Yard Dumpster
Whole-property clears, new construction, additions and large remodels.
View this size →40yd³40 Yard Dumpster
Bulky light debris only: fencing, patio covers, siding, insulation, furniture, fit-outs.
View this size →The Arlington Permit Timeline, Start To Finish
Work backwards from the machine. A demolition permit comes through the commercial building permit system with an aerial site plan showing the limits of demolition, proof of an asbestos survey, and a SWPPP once the site exceeds one acre. If the building is 50 years or older, its age is unclear, or it sits in the Landmark Preservation Overlay, the Landmark Preservation Commission reviews it: applications at least nine business days before a meeting that generally falls on the second Thursday, and the commission can release the permit or extend the Historic Stay by 45 days, but cannot deny it. Separately, DSHS wants notification at least 10 working days out, even where no asbestos is present. A single private residence or an apartment building of no more than four units is exempt from that notification under §296.1(c), but a five-plex or a strip retail unit is not. Then call Texas811 two working days before anything digs. One Start Center, 101 W. Abram Street, 2nd Floor, 817-459-6502.
Not sure this is the right service? Describe the job on the phone and we will point you at the right container even if it is a different service page. Call (817) 404-4864.
Get a flat quote
Two minutes on the phone gets you a size, a price and a delivery slot. No forms.
(817) 404-4864Recommended sizes
How it works
Demolition Debris Removal in four steps
- 1
Call us
Tell us the project, your address and when you want it. Two minutes on the phone and you have a flat price.
- 2
We deliver
Our driver walks the drop, lays protection boards and sets the container exactly where you want it.
- 3
You load it
Take your time within your rental window. Keep it level with the top rail and we handle the rest.
- 4
We haul it
Call or text when you are done. We pull it, sort what can be recovered and dispose of the rest properly.
Demolition Debris Removal FAQs
Do I have to notify anyone before a demolition in Arlington?
Yes, and the agency is the one people get wrong. In Texas the asbestos programme sits with the Department of State Health Services, not TCEQ, under the Texas Asbestos Health Protection Rules at 25 TAC Chapter 296. Notification is due at least 10 working days before demolition or abatement starts, and it is required even when no asbestos is present — a clean survey changes what the form says, not whether you file it. A single private residence, or an apartment building with no more than four dwelling units, is exempt under §296.1(c). The DSHS asbestos programme is on 512-834-6747.
My house was built in 1968. Why does that add a month?
Because it is over 50 years old. Arlington sends any building of 50 years or older, any building whose age cannot be determined, and anything in the Landmark Preservation Overlay to the Landmark Preservation Commission before a demolition permit is released. The commission generally meets the second Thursday of the month, applications are due at least nine business days ahead, and while it cannot deny the permit it can extend the Historic Stay by another 45 days. Since the trigger now captures everything built through roughly 1976, most of central and north Arlington is inside it. Build that into the schedule.
Do I need to call anyone before digging?
Yes. Texas811 is the notification centre, and notice is due no later than the 48th hour before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than the 14th day before — two working days in practice, under Chapter 251 of the Utilities Code. Penalties start at $500 to $1,000 for a first violation and climb from there. Setting a container on a driveway does not require it, but the moment your project digs — footings, a fence line, a pool demolition, a driveway tear-out — it does. Confirm current requirements at Texas811.
Can the container sit until the demolition finishes?
It can. There is no Arlington ordinance limiting how many days a container may stay and no screening requirement, so ignore any site that names one. What does apply is the nuisance chapter, which treats used, deteriorated or discarded building materials as a nuisance — but expressly exempts materials stored in a workmanlike manner as part of and in conjunction with an active building permit. Pulling the permit is itself the defence. If the box is going in a street or a traffic lane, that is a Temporary Traffic Control Permit from Public Works with at least three business days notice.
What cannot go in a demolition container?
Asbestos-containing material, in any quantity, ever — pre-1980 buildings routinely carry it in floor tile and black mastic, pipe and duct wrap, textured ceilings and roofing felt. Also out: paint, solvents, fuel, pesticides, bulk liquids, lead-acid batteries, used motor oil and used oil filters, all of which Texas bans from landfill disposal under 30 TAC §330.15(e). Whole tires are banned unless processed first. Appliances holding refrigerant must be evacuated by a certified technician before the shell is disposed of. Pre-1978 buildings also bring lead paint and the EPA RRP rule into the job.
More services
Other things we haul
Residential Dumpster Rental
Driveway placement for garage, attic, shed and side-yard cleanouts and remodels.
Learn more →Commercial Dumpster Rental
Scheduled and on-call containers for retail, restaurants, offices and property managers.
Learn more →Construction Dumpster Rental
Jobsite roll-offs and next-day swap-outs for builders, remodelers and GCs.
Learn more →Roofing Dumpster Rental
Weight-rated cans sized by squares and layers for asphalt shingle tear-offs.
Learn more →Roll-Off Dumpster Rental
10, 15, 20, 30 and 40 yard roll-offs across Arlington and Tarrant County.
Learn more →Same-Day Dumpster Rental
Call before the cut-off and we can usually get a container to you this afternoon.
Learn more →Junk Removal Dumpsters
Clear a garage, attic, shed or side yard on your own schedule.
Learn more →Estate Cleanout Dumpsters
Discreet, patient container service for families clearing a lifelong home.
Learn more →Concrete & Heavy Debris
Dedicated heavy cans for broken concrete, brick, flatwork and wet clay spoil.
Learn more →Yard Waste & Brush Removal
Separate clean loads for storm limb wood the 2 cubic yard kerbside cap will not take.
Learn more →Where we deliver
Demolition Debris Removal across Tarrant County and the DFW Metroplex
Same service, same flat rates, every town below. Pick yours for local placement and permit notes.
Talk to a real person
Need demolition debris removal in Arlington?
Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.
Serving Arlington, Tarrant County and the DFW Metroplex · Mon–Fri 6am–5:30pm, Sat 7am–2pm